H.Cope & Sons > Portfolio > Copes Blocks

Copes Blocks

Project 2 - The corner block - A feat of engineering by Beton block Project 2 - Use of our New corner blocks - Excellent results !! Project No 2 - Environmental improvements to our Moody Lane Site A view from the bottom of the slipway up the slope - good depth
Job done - Well done Lee, John & Stephen Cope There is quite an incline The last part of the slipway ramp - P400 + Accelerator + Fibre to beat the tide The day after casting - The ramp complete with flotsum !!
Eventually complete - The ramp slope in place and finished Tough going as the concrete workability could only be low due to the slope The ramp starts - Mr Lee Rawson doing a grand job ! The side walls complete leaving the ramp to concrete
Construction of the remaining slipway wall is rapid The walls are backfilled with semi dry concrete to stabilise The other side goes up in 15 minutes Construction is rapid with minimal noise and disruption
The tide exposes the bottom course of blocks The blocks are lifted via a 360 excavator ready for positioning Off Loading our Copes Blocks at the Yacht Club
Portfolio
PS Lincoln Castle Demolition
H.Cope & Sons Portfolio
Video Channel
Services
Demolition Contractors
Plant Hire
Asbestos Surveys & Removal
Skip Hire
Skip Sizes
Ready Mix Concrete
Concrete Types
Volume Calculator
Truck Sizes
Aggregates
Recycled Aggregates
Primary Aggregates
Waste Management
Information
Accreditations
Downloads
Environmental
Public Notices
Frequently Asked Questions
Contact & Location Details